Industrial & Manufacturing

They’re rarely pretty, but manufacturing and industrial facilities nevertheless have their own brand of beauty. To work as planned, these facilities demand careful attention to detail and exceptional quality control. Plumbing lines and ducts must be straight and precise. Connections have to be secure. Slabs must be flat. The integrity of the structure, and infrastructure, must be absolute. The perfect integration of the building with its equipment is critical, and no accident. This is the execution industrial clients count on – and exactly the execution Hoar delivers.

  • Airbus A320 Final Assembly Line

    Mobile, AL

    Hoar is providing program management services for the design and construction of the $600 million Airbus A320 Final Assembly Line project at Brookley Aeroplex in Mobile, Alabama. Hoar’s responsibilities include […]

    Learn More ›
  • GD Copper (U.S.A.) Inc.

    Pine Hill, AL

    GD Copper (Golden Dragon Copper) is a Chinese-owned, 500,000 square foot precision copper tubing manufacturing facility. Chinese and American cultural differences were apparent from the start and presented unique challenges for the contracting […]

    Learn More ›
  • Airbus Engineering Center

    Mobile, AL

    Attention to detail has always been a hallmark of Hoar Construction. For the Airbus Engineering Design Center, a structural steel frame building with a two-story curtain wall and a limestone veneer façade, the client […]

    Learn More ›
  • Yupo Synthetic Paper Plant

    Chesapeake, VA

    The success of any project depends on constant communication. This had never been more apparent than when building the Yupo Synthetic Paper Plant in Chesapeake Bay, Virginia. This massive project consisted of a 20,000 […]

    Learn More ›
  • Westwind C-130 Maintenance Hangar

    Huntsville, AL

    Assembling right team makes all the difference. On the Westwind Hangar project we incurred 50 plus days in weather related delays. Due to these delays, we identified the subcontractors who could make the biggest impact on […]

    Learn More ›
  • Fort Rucker Hangar

    Fort Rucker, AL

    The hangar repair project at Cairns Airfield, Ft. Rucker was awarded based on a lump sum cost. After the award of this project, it was determined the design of the 400 Hz power grid had an omission that would require extensive […]

    Learn More ›
  • Nektar Therapeutics

    Huntsville, AL

    At the time Hoar was selected to construct the Nectar Therapeutics expansion facility, the owner had little more than a basic floor plan. No MEP drawings existed. And no equipment had been purchased. Even so, time was of the […]

    Learn More ›