Feb 17, 2020 | Case Studies
We believe there is always an opportunity to do things better, especially if we make time early in a project to look for ways to improve our original plan. That’s what our team did while building an expansion for the Gestamp Alabama Plant 2 in McCalla. Our client’s...
Feb 17, 2019 | Case Studies
GD Copper USA, Inc. is a 500,000 square foot precision copper tubing manufacturing facility located in Wilcox County, AL. The building is so large, you could fit nine football fields inside. The facility’s operation required a full assembly line for copper production,...
Feb 17, 2018 | Case Studies
Our client, Texas A&M University, had been through multiple HVAC replacement projects on their campus — of all them challenging and most of them not completed on time. They needed a contractor with exceptional lean capabilities who could complete the HVAC...
Feb 17, 2017 | Case Studies
When the first Sacred Heart Children’s Hospital opened in 1969, it allowed specialized doctors and nurses to provide a level of care beyond that of a general pediatrician to the area. That put Pensacola on the healthcare map. Fast forward 45 years, and the need to...
Feb 18, 2016 | Case Studies
Dania Pointe, a 102-acre massive retail and mixed-use destination, started out as a former industrial and partially abandoned mass of land. Our client challenged us to help bring their vision to life and the first step was to redevelop the large brownfield site...
Feb 18, 2015 | Case Studies
Faith Community Hospital sets the standard for rural healthcare facilities. The previous hospital was nearing 60-years old and quickly becoming obsolete. Meanwhile, the population in Jack County had grown significantly over the last decade, furthering the need for...